Tameway Plaza

Walsall Town Centre

Overview

Tameway Plaza is Walsall’s tallest building and well renowned landmark, recognised for what the Black Country is famous for, its industrial past and progressive modern community.

Tameway Plaza is situated just a few minutes walk from the High Street, the Saddlers Shopping Centre and Walsall train station. Crown Wharf Shopping Park hosts a variety of warehouse-style outlets and restaurants.

Take a 360˚ Virtual Tour

Prosperity Wealth
Click to view

Key points

  • Property type:
    PDR Conversion
  • Location:
    Walsall Town Centre
  • Units available:
    143 one and two bed apartments
  • Guide price:
    £99,995 - £124,995
  • Predicted yield:
    6.6%

Status: Build underway

Estimated completion: Q4 2019

Find out more info about the development

It's all about the location

The development is centrally located in the business district, 8 miles north west of Birmingham city centre, with both the local motorway network and Birmingham relief road close by.

Transport Links 01

Transport Links

Walsall boasts a fantastic location with close links to Birmingham, Wolverhampton, Sutton Coldfield, Cannock, West Bromwich and instant access to the M6 Motorway.

02

Business Investment

A re-development hotspot with recent projects including Walsall Manor Hospital (£174million), Walsall College (£65m), Waterfront South (£60m) and St Matthew’s Quarter (£25m).

Business Investment
Shopping & Lifestyle 03

Shopping & Lifestyle

Saddlers Shopping Centre – the social hub of Walsall’s community. It’s the ideal place to meet friends and family, to eat, drink, work, and to enjoy leisure time.

04

Bars & Restaurants

As the largest industrial town in the West Midlands, there is no shortage of eateries, activities or nightlife.

Bars & Restaurants
Education 05

Education

12 junior schools, numerous secondary schools, including comprehensives, academies, private and grammar school. Walsall College provides further education.

06

Property Market

Walsall requires new homes to facilitate its rising local population due to extensive job creation within the region.

Property Market
Culture & Heritage 07

Culture & Heritage

With a rich industrial heritage, Walsall also became internationally famous for its leather trade. With royal connections the town still manufactures the Queen's handbags.

08

Green Spaces

Amongst the heart of this industrial town lies Walsall Arboretum, a beautiful Victorian public park and green space over 80 acres which has recently undergone major restoration.

Green Spaces

The property & investment

All homes will offer contemporary open plan living and dining space with oversized windows (where possible) ensuring maximum natural light.

With hardwood veneer floors and stainless steel sockets throughout these high grade specifications combined with custom built kitchens integral appliances and stylish bathroom designs come as standard for prosperity clients, offering a home with style, luxury and comfort.

Payment plans

Monthly & Mortgage Plan

1 Bedroom Apartment

Purchase Price: £99,995.00
Reservation Deposit: 5% 4,999.75 plus £850 legal fee
30% Deposit: 14 x £2,142.75
70% Mortgage arranged on completion
Mortgage then covered by rental income from completion
You own an income producing asset for life

Estimated gross rental income £550.00
Estimated gross rental yield 6.6%

The latest Development updates

Post boxes installed

Work underway on entrance

Work underway on entrance

Living space with view over Walsall

Finished kitchen at Tameway Plaza

Show apartment at Tameway Plaza

Tameway Plaza Site Update

  • Work onsite is progressing well
  • The next phase will be the commencement of lift installation and we are on target to start the foyers and onto the ground floor commercial space
  • Show apartment is now available for viewings
  • Estimated completion Q4 2019

Kitchen installation at Tameway Plaza

Kitchen installation at Tameway Plaza

Tameway Plaza Update

  • 2nd-12th floor completely dry lined and skimmed
  • 2nd-12th floor first fix electrics and plumbing underway
  • 4th-12th floor mist coated
  • Kitchens and bathrooms being fitted on 7th-12th floors
  • Fully fitted bathrooms, joinery, doors and architraves on 10th-12th floors
  • All window and sprinkler installation complete
  • Estimated completion date: Q4 2019

Plastering completed down to 9th floor

Boarding completed down to 6th floor

CGI of Tameway Plaza

Tameway Plaza Site Updte

  • Plastering complete down to 9th floor
  • Partioning and boarding complete down to 6th floor
  • Painting commenced on the top floor
  • First kitchens being installed
  • Show apartment due to be completed by second week of November
  • Estimated completion date: Q4 2019

Partitioning underway

Strip out 90% complete

Windows being installed

Tameway Plaza Site Update

  • Site setup completed
  • Strip-out: 90% complete
  • First fix electrics underway
  • Partitioning underway
  • Windows being installed
  • Estimated completion date: Q4 2019

Full steam ahead with strip out

Tameway Plaza Site Update

  • Site mobilisation completed
  • Strip out commenced 4th June
  • Estimated completion date: Q4 2019

Tameway Plaza Site Updte

  • ALB Group (building contractors) specification and build program received
  • Program to be reviewed by BACE (construction consultants)
  • JCT design and build contract to be issued to ALB Group
  • Estimated completion date for this development: Q3 2019