• Site setup and strip out is now complete.
External front
.• The roof is now complete.
• Windows have been installed.
• Drainage is now complete.
• All floors 1st fix electric fitted and plumbed.
• All units dry lined completely.
• Third floor and second-floor plaster complete.
Rear elevation
• The windows are now complete.
Maisonettes
• Foundation work beginning 17/11/21.